Document/Purpose

 

Traceability (Upstream /Downstream) Documents

Upstream:
Downstream:

Status

pre-DRAFT WORK ON THIS SECTION HAS NOT STARTED.

Baseline Version/Date | Current Version

Not yet established | v0.1

Last Updated

 

Owner / Lead

 Sanjay Chadha

Contributors

 

Reviewers

 

Scope/Out-Of-Scope

Scope:
Out-of-Scope:

Key Summary T Created Updated Assignee Reporter Status
STKR-46
RPOD operations shall be monitorable from the customer ground station
Requirement 16/Mar/26 3:01 PM 16/Mar/26 3:01 PM Unassigned Salman Javed

To Do
STKR-45
The IOR System shall comply with applicable planetary protection and contamination control guidelines for missions operating beyond Earth orbit.
Requirement 16/Mar/26 2:53 PM 16/Mar/26 2:53 PM Unassigned Salman Javed

To Do
STKR-44
The IOR System and associated missions shall comply with national licensing and regulatory authorization requirements for launch, on-orbit operations, and space servicing activities.
Requirement 16/Mar/26 2:53 PM 16/Mar/26 2:53 PM Unassigned Salman Javed

To Do
STKR-43
The IOR propellant delivery system shall be capable of refueling IOR depots as well as other depots implementing compatible standardized refueling interfaces.
Requirement 16/Mar/26 2:40 PM 16/Mar/26 2:40 PM Unassigned Salman Javed

To Do
STKR-42
An IOR propellant depot shall be capable of being refuelled by any compatible standardized propellant delivery system.
Requirement 16/Mar/26 2:39 PM 16/Mar/26 2:39 PM Unassigned Salman Javed

To Do
STKR-41
The IOR architecture shall support multiple propellant depots deployed across different orbital regimes (e.g., LEO, GEO, Earth-Moon L1/L2, and Lunar Orbit).
Requirement 16/Mar/26 2:39 PM 16/Mar/26 2:39 PM Unassigned Salman Javed

To Do
STKR-40
The IOR system shall support autonomous Rendezvous, Proximity Operations and Docking (RPOD) and propellant transfer operations.
Requirement 16/Mar/26 2:38 PM 16/Mar/26 2:38 PM Unassigned Salman Javed

To Do
STKR-39
The IOR system shall be capable of servicing IOR-Cooperative spacecraft, utilizing cooperative RPOD sequences coordinated between the servicing system and the client spacecraft.
Requirement 16/Mar/26 2:37 PM 16/Mar/26 2:37 PM Unassigned Salman Javed

To Do
STKR-38
The IOR system shall be capable of servicing IOR-Aware spacecraft, utilizing closed-loop operational feedback provided by the client spacecraft to enhance RPOD and refuelling operations.
Requirement 16/Mar/26 2:36 PM 16/Mar/26 2:36 PM Unassigned Salman Javed

To Do
STKR-37
The IOR system shall support servicing of the three spacecraft categories defined in the Mission Objectives: Interface-Enabled, IOR-Aware, and IOR-Cooperative spacecraft.
Requirement 16/Mar/26 2:35 PM 16/Mar/26 2:35 PM Unassigned Salman Javed

To Do
STKR-36
RPOD operations shall be monitorable and controllable from the owner ground station.
Requirement 14/Mar/26 1:43 PM 14/Mar/26 1:43 PM Unassigned Salman Javed

To Do
STKR-35
RPOD operations including propellant transfer, detachment, and departure shall be executable through autonomous and/or ground-controlled methods.
Requirement 14/Mar/26 1:42 PM 14/Mar/26 1:42 PM Unassigned Salman Javed

To Do
STKR-34
The IOR system shall support servicing of passive third-party spacecraft fitted with an approved fuel interface.
Requirement 14/Mar/26 1:41 PM 14/Mar/26 1:41 PM Unassigned Salman Javed

To Do
STKR-33
The SV shall perform active RPOD functions to cooperative, passive client spacecraft equipped with an approved fuel interface.
Requirement 14/Mar/26 1:40 PM 14/Mar/26 1:40 PM Unassigned Salman Javed

To Do
STKR-32
The SV shall have the capability to perform Rendezvous, Proximity Operations, and Docking (RPOD).
Requirement 14/Mar/26 1:28 PM 14/Mar/26 1:28 PM Unassigned Salman Javed

To Do
STKR-31
The IOR System shall ensure compliance with Orbital Debris Mitigation Standard Practices (ODMSP) as applicable
Requirement 14/Mar/26 1:00 PM 14/Mar/26 1:00 PM Unassigned Salman Javed

To Do
STKR-30
The solution shall comply with CNSSP No. 12 as applicable.
Requirement 14/Mar/26 1:00 PM 14/Mar/26 1:00 PM Unassigned Salman Javed

To Do
STKR-29
The SV shall be manufactured and qualified in accordance with applicable National Security Space Launch Port Launch Users Guide requirements.
Requirement 14/Mar/26 12:59 PM 14/Mar/26 12:59 PM Unassigned Salman Javed

To Do
STKR-28
The SV shall adhere to recognized industry standards and best practices for on-orbit servicing.
Requirement 14/Mar/26 12:58 PM 14/Mar/26 12:58 PM Unassigned Salman Javed

To Do
STKR-27
The Customer requires the IOR system to achieve a propellant transfer rate of not less than X kg per minute.
Requirement 14/Mar/26 12:53 PM 16/Mar/26 3:41 PM Unassigned Salman Javed

To Do

Showing 20 out of

44 issues