1.9.1 Naming Convention

[doc_toc] Naming Convention OPCON Stages Examples OPC-LAUNCH OPC-ORBIT_INSERT OPC-STANDBY OPC-RENDEZVOUS OPC-PROXIMITY_OPS OPC-DOCKING OPC-PROP_TRANSFER OPC-UNDOCKING OPC-RETURN OPC-DISPOSAL Requirements IOR-<LEVEL>-<CATEGORY>-NNN LEVEL STKR = Stakeholder Requirement MISR = Mission Requirement SYSR = System Requirement DERR = Derived Requirement VERI = Verification Requirement HSWR – High Level Software Requirement LSWR – Low Level Software Requirement CATEGORY Discipline grouping OPEC […]

1.9 Appendix

Naming Convention OPCON Stages Examples OPC-LAUNCH OPC-ORBIT_INSERT OPC-STANDBY OPC-RENDEZVOUS OPC-PROXIMITY_OPS OPC-DOCKING OPC-PROP_TRANSFER OPC-UNDOCKING OPC-RETURN OPC-DISPOSAL Requirements IOR-<LEVEL>-<CATEGORY>-NNN LEVEL STKR = Stakeholder Requirement MISR = Mission Requirement SYSR = System Requirement DERR = Derived Requirement VERI = Verification Requirement HSWR – High Level Software Requirement LSWR – Low Level Software Requirement CATEGORY Discipline grouping OPEC = […]

1.8 Boundaries and Interfaces

  Document/Purpose  External and Internal Interfaces defined Traceability (Upstream /Downstream) Documents Upstream: Downstream: System Requirements Status DRAFT – Ready for Review Baseline Version/Date Current Version Not yet established | v0.1 04 Mar 2026 Last Updated  23 Mar 2026 Owner / Lead  Sanjay Chadha Contributors Reviewers Scope/Out-Of-Scope Scope: System Design, System Requirements, System Analysis, Out-of-Scope: Physical Architecture […]

1.7 Physical Architecture

Document/Purpose   Traceability (Upstream /Downstream) Documents Upstream: Downstream: Status pre-DRAFT WORK ON THIS SECTION HAS NOT STARTED. Baseline Version/Date | Current Version Not yet established | v0.1 04 Mar 2026 Last Updated  07 Mar 2026 Owner / Lead  Sanjay Chadha Contributors   Reviewers   Scope/Out-Of-Scope Scope: Out-of-Scope: Key Summary T Created Updated Assignee Reporter Status STKR-46 […]

1.6 Logical Architecture

Document/Purpose Traceability (Upstream /Downstream) Documents Upstream: 1.5 Functional Architecture and Activities Downstream: 1.7 Physical Architecture Status Pre-DRAFT Baseline Version/Date | Current Version Not yet established | v0.1 04 Mar 2026 Last Updated  07 Mar 2026 Owner / Lead  Sanjay Chadha Contributors Reviewers Scope/Out-Of-Scope Scope: Out-of-Scope: [doc_toc] IOR Service Provider (ISP) Ground Segment (GS) The IOR Service […]

1.5 Functional Architecture and Activities

  Document/Purpose Traceability (Upstream /Downstream) Documents Upstream: 1.3 Concept of Operations (CONOPS) Downstream: 1.4 System Requirements, 1.6 Logical Architecture Status Pre-DRAFT Baseline Version/Date | Current Version Not yet established | v0.1 04 Mar 2026 Last Updated  22 Mar 2026 Owner / Lead  Sanjay Chadha Contributors Reviewers Scope/Out-Of-Scope Scope: System Design, System Requirements, System Analysis, Out-of-Scope: Physical […]

1.4 System Requirements

Document/Purpose Documents the system requirements transformed from stakeholder needs, mission requirements, Traceability (Upstream / Downstream) Documents Upstream: Stakeholder Requirements, Mission Requirements, OpCons, Regulatory requirements, system constraints, Downstream: System Analysis, Logical Architecture Status Pre-DRAFT WORK ON THIS SECTION HAS NOT STARTED. Baseline Version/Date | Current Version Not yet established | v0.1 4 Mar 2026 Last Updated  7 […]

1.3 Concept of Operations (CONOPS)

  Document/Purpose Defines the operational concept of the IOR mission including mission context, actors, operational contexts, system actors, their interactions, and OPCON stages. Reference: https://www.linkedin.com/pulse/mission-system-requirements-whats-difference-why-does-alan-fromberg-felkc/ Traceability (Upstream /Downstream) Documents Upstream: Mission Context, Stakeholder Requirements Downstream: Mission Requirements (note), System Requirements Status DRAFT Baseline Version/Date | Current Version Not yet established | v0.1 04 Mar 2026 Last […]

1.1.1 Mission Context

Document/Purpose Defines the operational environment of the IOR mission, identifies external actors, and describes how the system interacts with them. Reference: https://arcadia-method.org/operational-analysis.html Traceability (Upstream /Downstream) Documents Upstream: Business / Mission Analysis Downstream: Operational Analysis, OPCON Stages, Stakeholder Needs Status DRAFT Baseline Version/Date | Current Version Not yet established | v0.1 04 Mar 2026 Last Updated  07 […]

1.2.2 Mission Requirements

Document/Purpose Defines the mission-level requirements the IOR system must satisfy to achieve the mission objectives. Reference: https://www.linkedin.com/pulse/mission-system-requirements-whats-difference-why-does-alan-fromberg-felkc/ Traceability (Upstream /Downstream) Documents Upstream: Stakeholder Requirements Downstream: CONOPS, System Requirements Status DRAFT Baseline Version/Date | Current Version Not yet established | v0.1 Last Updated   Owner / Lead Contributors Reviewers Scope/Out-Of-Scope Scope: Mission level requirements for the IOR […]